The capital
behind compute.
Independent research on GPU financing and data centre finance: how GPUs, data centres and the power behind them are financed, read from the public record.
- 554
- Deals
- 140
- Operator & issuer profiles
- 169
- Lenders
- 68
- Projects
In-house counsel? Open the legal desk
Latest deals
- Rowan Digital Infrastructure US$1.5bn corporate financing (term loan upsize, revolver and letter of credit facility)US$1.545bn
- Blackstone Digital Infrastructure Trust AWS joint ventures US$2.5bn mortgage loan commitmentsUS$2.5bn
- Blue Owl Digital Infrastructure Trust GCDC 3 Gainesville mortgage loanUS$512.6m
Get it on Fridays
The research, in numbers
- Deals
- 554
- Operator & issuer profiles
- 140
- Lenders
- 169
- Projects
- 68
Coverage 2015 to 19 November 2026. Counts are research coverage, not unique originations or a complete market total. About the data →
1 Land & powerPower comes before the building.
Powered land is valued on its grid connection: the interconnection agreement, the substation and the date it energises. Utility supply, contracted power and energised IT load are different quantities, and each needs its own evidence.
- Projects & programmes tracked
- 68
Latest on the registerAtlas Energy SolutionsData centre power equipment bridge facility · US$424m
2 On-site generation & storageBridging the wait for the grid.
Behind-the-meter gas engines and battery storage can bring capacity forward or carry the halls when the grid cannot. They are energy assets with their own lenders, so the fuel supply agreement, the power purchase or tolling contract and who carries performance risk become credit questions.
3 The shellFrom construction loan to securitised asset.
Construction debt is sized against a budget and a completion date. Once the halls are leased and stabilised, the same building can refinance through CMBS, ABS or lease-backed project bonds, usually on different terms.
Register records, including histories and amendments; not unique originations. The component cutaway and internal frame are illustrative.
Latest on the registerHaoyang Data Center 1 (Thailand)Phase 1 bank facilities · US$590m
4 Cooling & electricalWhere completion risk sits.
Chillers, switchgear and UPS are long-lead equipment and a large share of fit-out cost. Delivery slots, contractor security and commissioning tests decide when a facility can draw its debt and when rent starts.
5 ComputeThe GPUs are the collateral.
GPU fleets are financed with delayed-draw term loans secured on the equipment and the customer contracts it serves. Lenders size them against contracted cash flow and a view of residual value, because the hardware can lose value much faster than a building.
- Selected disclosed margins over SOFR
- +225–550bp
- GPU-secured records
- 44
6 selected facilities. Across all disclosed GPU loans the range is 225–750bp. Margins exclude the benchmark, fees and issue discount; they are not an all-in cost.
Latest on the registerHIVE Digital TechnologiesHIVE BUZZ Alpha Cloud GPU-secured term loan for sovereign AI cluster · US$129m
The tenant pays for it all.
Fibre and interconnection tie the campus to its customers, and the customer contract is what lenders underwrite. Take-or-pay terms, the tenant’s credit and step-in rights decide how the debt is repaid if something goes wrong.
Read the register from your side of the deal.
The same register, read five ways.
Financing research
- Updated
- 19 November 2026
- Coverage
- 2015–2026
- Records
- 554, each with its source
Data centre and GPU financing research, from the public record
Follow the financing.
Every layer of the campus you have just explored has its own lenders, terms and evidence. The register keeps each financing with its source, from data-centre bonds and securitisations to project loans and GPU facilities.
Or go straight to BenchmarksInsightsLegal desk
- Disclosed debt financing recorded
- US$973.2bn
- 431 debt records at deal-date exchange rates. Not a market total.
- How the total is built →
- Financings dated 2026 so far
- 185
- The most of any year in the register, ahead of 158 in 2025.
- Every record by year →
- Falling due in 2029
- US$80.8bn
- Original amounts of 46 maturities, the peak year. Not current balances.
- Debt maturity calendar →
As of the register update of 19 November 2026. Counts are research coverage from public sources.
From the register
- 12 Nov Rowan Digital Infrastructure US$1.5bn corporate financing (term loan upsize, revolver and letter of credit facility) US$1.54bn
- 11 Nov Blackstone Digital Infrastructure Trust AWS joint ventures US$2.5bn mortgage loan commitments US$2.5bn
- 10 Nov Blue Owl Digital Infrastructure Trust GCDC 3 Gainesville mortgage loan US$512.6m
- 5 Nov Haoyang Data Center 1 (Thailand) phase 1 bank facilities US$590m
- 4 Nov Meta EUR9bn six-tranche senior notes November 2026 €9.0bn
- 3 Nov Meta US$15bn five-tranche senior notes November 2026 US$15.0bn
From the grid to the GPU
Four steps into one campus, and the financing at each one.
From the substation that powers the site to the GPU board that secures the loan.




Step 1 · The grid
Power comes before the building.
Powered land is valued on its grid connection: the interconnection agreement, the substation and the date it energises.
Photo: janilson furtado on Unsplash, duotone by InfraCompute.
Step 2 · The campus
Powered land, then the halls.
Development finance buys and powers the land. Construction loans are sized against a budget and a completion date.
Illustration generated for InfraCompute with Higgsfield.
Step 3 · The hall
From construction loan to securitised asset.
Once leased and stabilised, a hall can refinance through data centre ABS, CMBS or lease-backed project bonds.
Data centre ABS traps cash at 1.30x to 1.35x DSCR.*
Illustration generated for InfraCompute with Higgsfield.
Step 4 · The GPU
The GPUs are the collateral.
Delayed-draw term loans secured on the GPUs and the customer contracts, sized against contracted cash flow and a view of residual value.
GPU loans trap cash at 1.10x to 1.15x.*
Illustration generated for InfraCompute with Higgsfield.
*Drawn from public sources only. Not our view of what is market.
Where to start
Start with your question
Pick a question to see where the answer is.
554
financings in the register to compare against
Which deals compare to mine?
Search the register. Every deal page lists comparable financings from other borrowers and says what matches and what differs.
33
filed clause extracts, by clause type
What did the filed deals agree on a term?
The filed wording on cash traps, covenants, backstops and step-in, and where each side usually lands.
450
filed credit agreements, leases and backstops
How is it structured and secured?
Security over GPUs country by country, and the filed credit agreements, leases and backstops behind each structure.
12m · 24m · 5y
maturity windows, by instrument and region
What falls due, and when?
Original financing amounts by year due, from bonds, ABS and loans, with indicative dates kept apart.
13
questions lenders ask of a contract
Will lenders accept this contract?
Run a customer contract or lease through the questions lenders ask, and see what the counterparty has signed before.
140
operator and issuer profiles
What has this company raised before?
Each operator's and issuer's financings on one page, and the lenders that keep coming back.
What does GPU
debt cost?
Six disclosed floating margins over SOFR.
Explore the terms, then inspect the structure.
Points are separate facilities, not a continuous market index. Hover or focus a point for its date and margin; select it to inspect the record.
Historical selected terms, not a risk-adjusted ranking or an all-in cost index. Margins exclude the benchmark, fees, OID and hedging. Dates and structures differ. Mixed-rate parent packages and fixed coupons are excluded. Data cut: 22 October 2026.
Start with your side of the deal.
The same register, read four ways.
Follow the next financing.
- Cipher DigitalCipher Digital 0.00% convertible senior notes due 2032
- DayOneDayOne Johor syndicated term loan upsize to US$7.2bn
- Digital RealtyDigital Realty EUR1bn 5.125% green guaranteed notes due 2036
- Digital RealtyDigital Realty CHF510m guaranteed notes (2029, 2032, 2036)
- GMI CloudCTBC-led GPU financing